PO Box 1877, Winchester, VA 22604-8377
315 Tasker Road, Stephens City, VA 22655
540.868.1061 voice
540.868.1429 fax
(1) full-size and (1) half-size hard copies of the entire approved plan set to the address above.
A digital copy of the entire approved plan set as a multi-page PDF to admin@frederickwater.com.
A copy of the recorded onsite Frederick Water (FW) easement(s) is/are required.
A copy of the recorded offsite FW easement(s) is/are required.
This project also requires DEQ – Valley Region Office approval.
This project also requires VDH – Culpeper Field Office approval.
This project requires VDH – Culpeper Field Office – Project Summary Report by date for drawings above (see website for form).
This project has a sewer pump station that FW will own. Title to the pump station site shall be granted to FW in fee simple absolute. Also, (1) a copy of DEQ's Certificate to Construct, (2) a copy of DEQ's Certificate to Operate, and (3) two copies of the FW-approved O&M manual are required. These documents must be received before service will be authorized.
WORK INVOLVING THE CONNECTION TO OR INSTALLATION OF FREDERICK WATER FACILITIES, OR ANY ACTIVITY REQUIRING FREDERICK WATER INSPECTIONS, CANNOT BEGIN UNTIL THE DRAWINGS, OFF-SITE EASEMENT (IF REQUIRED), AND CONTRACT (IF REQUIRED)—SENT SEPARATELY TO THE OWNER—HAVE BEEN RETURNED TO THIS OFFICE